1.1.13 Table of Amendments

Amendment No.

Adopted Date

Description of Changes

Original

16 September 2019

Camden DCP 2019 came into effect.

1.

7 January 2020

Additional Schedule 13 – 190 Raby Road, Gledswood Hills came into effect.

2.

26 May 2020

Additional Section 6.4.4 site specific controls for Little Street Camden came into effect

3.

9 June 2020

Additional Section 6.4.5 – Glenlee Industrial Precinct

4.

22 June 2020

Updated Schedule 6 – Camden Lakeside to increase dwellings, amend masterplan and road hierarchy. 

5.

25 October 2021

Removed Chapter 1.2 - Notification and Advertising Requirements, which has been replaced by the new Camden Community Participation Plan 2021

6.

1 June 2023

  • Introduced ‘Employment Zone Hierarchy’ to Chapter 5.1.
  • Moved Chapters 6.3 Industrial Land Uses and 6.4 Site Specific Industrial Controls to Part 5.
  • Revised references to previous B, IN, and E zones.
  • Revised references to SEPPs.
  • Amended page, table, and figure numbering.

7.

30 July 2024

Amendments to Schedule 5 - Mater Dei and Kirkham Rise

8.

19 September 2024

Amendments to Schedule 8 - Emerald Hills