• Skip to Content
Camden Council Logo Camden Council Logo

My Pages
Search
My pages
  1. Home
  2. Schedules
  3. Schedule 8 Emerald Hills
  4. Subdivision Planning and Design
  5. Stormwater Management
S8.2 Subdivision Planning and Design
  • S8.2.1 Neighbourhood and Subdivision Design
  • S8.2.2 Street, Pedestrian and Cycle Network
  • S8.2.3 Bulk Earthworks and Retaining Walls
  • S8.2.4 Open Space, Public Domain and Fencing
  • S8.2.5 Vegetation Conservation
  • S8.2.6 School and Communities Facilities Precinct
  • S8.2.7 Acoustic Amenity
  • S8.2.8 Stormwater Management
  • S8.2.9 Bushfire Risk Management
  • S8.2.10 Large Lots within Environmental Conservation
  • S8.2.11 Scenic Character Protection Area
  • S8.2.12 Aboriginal and European Heritage

S8.2.8 Stormwater Management

Favourite This Page

Objectives

  1. Provide the framework for the protection and enhancement of water quality and management of stormwater within the Site.

Control

  1. The design and performance of the stormwater management system infrastructure must have regard to the Water Sensitive Urban Design measures contained within the Cardno, May 2013, Water Cycle Management Report and addendum reports dated June 2013.
Previous Page
S8.2.7 Acoustic Amenity
Next Page
S8.2.9 Bushfire Risk Management

Contact Camden Council

(02) 4654 7777
Email

Website designed and developed by
Greenhouse Creative

Camden Council Playtpus Logo
  • Home
  • Toggle Menu

Contents

  • 1. Introduction
  • 2. General Land Use Controls
  • 3. Residential Subdivision
  • 4. Residential Dwelling Controls
  • 5. Employment Zones Development
  • 6. Specific Land Use
  • Appendix
  • Schedules
  • Assessment Tables
  • Download DCP 2019
  • Index