Skip to Content
Search
Search
My Pages
Search
My pages
Home
Schedules
Schedule 2 Spring Farm
Subdivision Planning and Design
Pedestrian and Cycle Network
S2.2 Subdivision Planning and Design
Open Submenu
S2.2.1 Neighbourhood and Subdivision Design
S2.2.2 Former School Site (Lot 101 DP 1121699, Lot 200 DP1182085, and Lot 2 DP1175939)
S2.2.3 Street Network and Design
S2.2.4 Pedestrian and Cycle Network
S2.2.5 Public Transport Network
S2.2.6 Parks and Open Space
S2.2.7 Bush and Riparian Corridors in Spring Farm
S2.2.4 Pedestrian and Cycle Network
Favourite This Page
Controls
The pedestrian and cycle path network for Spring Farm is to be constructed to comply Figure 2-13.
Cycle and pedestrian bridges must be located above the 20 year ARI flood level.
Figure 2-13: Spring Farm Pedestrian and Cycle Path Network
Previous Page
S2.2.3 Street Network and Design
Next Page
S2.2.5 Public Transport Network
Home
Toggle Menu
Contents
1. Introduction
2. General Land Use Controls
3. Residential Subdivision
4. Residential Dwelling Controls
5. Employment Zones Development
6. Specific Land Use
Appendix
Schedules
Assessment Tables
Download DCP 2019
Index