The controls listed below (Table 2.1) are specific to the Spring Farm Release Area. They must be read in conjunction with the controls in section Part 4 of this DCP. In the event of any inconsistency, the controls included in this subsection will take precedence.
Front setback
- The minimum front setback of a residential building is 4m.
- The minimum front setback of a residential building fronting collector roads (including Liz Kernohan Drive) is 4.5m
Secondary street setback
- The minimum secondary street setback of a residential building is 1m.
- The minimum secondary street setback of a residential building fronting Liz Kernohan Drive is 2m.
SETBACKS |
|
---|---|
Front setback (min) |
4m |
Front setback – collector road (incl. Liz Kerhohan Drive) (min) |
4.5m |
Secondary street setback (min) |
1m |
Secondary street setback - collector road (incl. Liz Kernohan Drive) (min) |
2m |
Side setback (min) |
0.9m |
Rear setback ground floor (min) |
4m |
Rear setback first floor (min) |
6m |
Garage setback (min) |
1m behind principal building line and 5.5m from front boundary; third garage to be set back 2m behind principal building line. |
Architectural element front setback encroachment (max) |
1.5m |
Rear lane setback (min) |
1m. Notwithstanding this, the rear lane setback can be reduced to 0.5m only if it can be adequately demonstrated to Council’s satisfaction, that the development can facilitate waste collection in a safe and orderly manner. |
Public reserve setback (min) |
3m |
HEIGHT |
|
As per LEP 2010 and Part 4 of this DCP. |
|
PRIVATE OPEN SPACE, LANDSCAPING AND SITE COVERAGE |
|
Site coverage (max) – lots less than 450m2 |
Single storey development - 60% |
Two storey development – 50% ground floor, 35% upper floor |
|
Site coverage (max) – lots 450m2 or greater |
Single storey development - 50% |
Two storey development – 50% ground floor, 30% upper floor |
|
Landscaped area (min) |
30% |
Landscaped area (min) within the front setback |
40% |
Principal private open space (PPOS) (min) |
24m2 with a minimum dimension of 4m |
Gradient of PPOS (max) |
1:10 |
Solar access to PPOS (min) |
Direct sunlight must reach at least 50% of the PPOS of both the subject dwelling and of any adjoining dwelling for not less than 3 hours between 9:00am and 3:00pm on 21 June.
|
GARAGE DESIGN |
|
Garage door width (max) – lots 7-15m wide |
60% of front elevation width |
Garage door width (max) – lots greater than 15m wide |
50% of front elevation width |