S3.2.4 Parks and Open Space

  1. Requirements for bushland restoration are provided in the Plan of Management prepared by Conacher Travers (2003). All development consents must implement the recommendations of the Conacher Travers Plan of Management.
  2. A path system must be constructed to provide links across and through the area, connect with the bushland regeneration areas, and the Currans Hill open space system. Emergency and service vehicle access will be controlled.